2.2.2 Electricity transmission
|
FY2018 Production Performance |
Total supply, mln kWhkilowatt-hour |
Net supply *, mln kWhkilowatt-hour |
Losses |
Mln kWhkilowatt-hour |
% |
Permenergo |
17,95 |
16,204 |
1,745 |
9.72 |
Sverdlovenergo |
30,617 |
28,938 |
1,679 |
5.48 |
Chelyabenergo |
17,777 |
16,345 |
1,432 |
8.06 |
IDGCInterregional Distribution Grid Company of Urals |
66,343 |
61,487 |
4,856 |
7.32 |
* at the boundaries of operational responsibility area
In 2018, the Company’s net supply to consumers and regional grid operators at the boundaries of operational responsibility area amounted to 61,487 million kWhkilowatt-hour (- 672 million kWhkilowatt-hour or -1.08% YoYyear on year, if compared to 62,158 million kWhkilowatt-hour transmission metrics of 2017) due to the statutory termination of the last-mile scheme in the Chelyabinsk region since 01.07.2017.
|
Electricity losses |
2017 |
2018 |
Change* |
Million kWhkilowatt-hour |
% |
% under comparable conditions** |
Million kWhkilowatt-hour |
% |
Million kWhkilowatt-hour |
% |
Permenergo |
1,887 |
10.51 |
10.51 |
1,745 |
9.72 |
-137 |
-0.78 |
Sverdlovenergo |
1,757 |
5.86 |
5.86 |
1,679 |
5.48 |
-63 |
-0.37 |
Chelyabenergo |
1,504 |
7.78 |
8.9 |
1,432 |
8.06 |
-121 |
-0.85 |
IDGCInterregional Distribution Grid Company of Urals |
5,148 |
7.65 |
7.94 |
4,856 |
7.32 |
-321 |
-0.62 |
* Change of relative electricity losses in % is calculated as the difference between 2018 and 2017 values, factoring in changes in consumer structure, operation mode of the networks; change of absolute electricity losses is calculated as a product of changed relative electricity losses and 2018 net supply
** Level of electricity losses, set for conditions comparable to conditions of operations of OAOOpen Joint-Stock Company IDGCInterregional Distribution Grid Company of Urals or its branch in 2017 in terms of consumer structure, operation mode of the networks;
An important factor taken into account to level 2017 electricity losses and 2018 operating conditions of Chelyabenergo is exclusion of “last-mile” facilities from net supply, as ОАО MMKMagnitogorsk Metallurgy Plant, PAOPublic Joint-Stock Company ChMKChelyabinsk Metallurgy Plant, ОАО RZhDRussian Railroads, ООО Gazprom Transgaz Yekaterinburg, ООО Kemma, ZAO Chebarkul Plant Soyuzteplostroy concluded direct contracts with PAOPublic Joint-Stock Company FSK UESFederal Grid Company of United Energy System since Jul.01,2017.
Branch |
Legal entities |
Individuals |
Permenergo |
27,860 |
731,575 |
Sverdlovenergo |
19,644 |
402,222 |
Chelyabenergo |
24,814 |
688,785 |
IDGCInterregional Distribution Grid Company of Urals |
72,318 |
1,822,582 |
Customers |
Permenergo |
Sverdlovenergo |
Chelyabenergo |
Industrial consumers |
8,164,813 |
19,037,557 |
7,362,629 |
Transportation |
62,074 |
2,869,286 |
1,704,661 |
Non-industrial consumers |
2,030,633 |
2,870,760 |
2,445,842 |
Agricultural consumers |
329,169 |
249,743 |
285,774 |
Residents and the like |
2,206,475 |
1,284,571 |
1,954,623 |
Wholesale consumers – resellers |
3,411,196 |
2,626,224 |
2,591,060 |
TOTAL |
16,204,361 |
28,938,142 |
16,344,588 |