RU | EN
    1. 1 About us
    2. 1.1 Mission and strategic goals
    3. 1.2 Branches and subsidiaries
    4. 1.3 Market share and sector development trends
    5. 1.4 Management systems
    6. 1.5 Key 2018 events

For the operation of the site, we collect cookies, information about the IP address and location of users. If you do not want this data to be processed, please leave the site.

1.5 Key 2018 events

January
  • OAOOpen Joint-Stock Company IDGCInterregional Distribution Grid Company of Urals has entered Russia’s Top-100 public companies by their market value.
  • Sverdlovenergo specialists have completed the refurbishment of 110/10 kV “Gari” substation (Serov District).
February
  • The Company has presented its FY2017 RASRussian Accounting Standards results.
  • Our Chelyabenergo branch has connected a new power heating station to the networks (City of Troitsk).
  • The Government of the Sverdlovsk Region and OAOOpen Joint-Stock Company IDGCInterregional Distribution Grid Company of Urals have reached an agreement in joint efforts to develop the Middle Urals grids.
  • Permenergo’s Berezniki Electric Grids has acquired a DJI Phantom quadcopter.
March
  • The Company has presented its FY2017 IFRSInternational Financial Reporting Standards results.
April
  • Assignment of the PoLRprovider of the last resort function (former service area of AOJoint-Stock Company Roskommunenergo). More details in “Financial Capital Build-Up”
  • Sverdlovenergo’s Central Electric Grids has launched a new dispatcher panel with Russian-made software.
  • Permenergo specialists have completed the refurbishment of 35/10 kV “Verkh Yazva” substation.
  • The Company has presented its 1Q 2018 RASRussian Accounting Standards results.
May
  • The Company has presented its 1Q 2018 IFRSInternational Financial Reporting Standards results.
  • Annual General Meeting of Stockholders.
June
  • Our Chelyabenergo branch has connected an Agricultural Holding Fermer 74 new production site to the networks (Etkul District).
  • The Company has discussed digital network roll-out perspectives with representatives of the ITinformation technologies business.
July
  • Assignment of the PoLRprovider of the last resort function (former service area of PAOPublic Joint-Stock Company Chelyabenergosbyt). More details in “Financial Capital Build-Up”
  • Participation in INNOPROM-2018 Global Exhibition (Yekaterinburg).
  • The Company has presented its 1H 2018 RASRussian Accounting Standards results.
August
  • Assignment of the PoLRprovider of the last resort function (former service area of OOOLimited Liability Company NUESKNovouralskaya Energosbytovaya Kompaniya (Novouralsk Energy Sales Company)). More details in “Financial Capital Build-Up”
  • The Company has arranged a workshop on digital network roll-out.
  • The Company has presented its 1H 2018 IFRSInternational Financial Reporting Standards results.
September
  • Our Permenergo branch has leased grid facilities of Gamovo settlement.
  • PAOPublic Joint-Stock Company Rostelekom has installed over 7.0 thous. smart meters under an energy service contract with our Chelyabenergo branch.
October
  • Our Permenergo branch has completed the refurbishment of 110/35/6 kV “Perm” substation.
  • The Company has presented its 9M 2018 RASRussian Accounting Standards results.
November
  • The Company has obtained its 2017/2018 autumn/winter operations certificate.
  • Moody’s rating agency has confirmed the Company’s CFRcorporate family rating at Ba1, Stable outlook.
  • The Company has presented its 9M 2018 IFRSInternational Financial Reporting Standards results.
  • Our 110/10 kV “Ferrosplav” substation was equipped with information acquisition and transmission system (Serov).
December
  • Our Permenergo branch has completed the refurbishment of 35/10 kV “Kasib” substation.
  • Participation in Electric Grids 2018 Global Forum (Moscow).
  • Our Chelyabenergo branch has completed the overhaul of 110 kV “Zlatoust — Taganay” aerial power line.
  • Our Permenergo branch has launched a new EVelectric vehicles charging station (Perm).
  • Our Sverdlovenergo branch has completed the overhaul of 110/35/6 kV “Markovskaya” substation.